Analisis efisiensi waktu perencanaan proyek dengan metode lintasan kritis pada proyek pembangunan konstruksi elektrical dan instrumen



Tidak Tersedia Deskripsi


Ketersediaan

wzwzMy Library (Rak J)Tersedia

Informasi Detil

Judul Seri
Abstrak : Finishing of the projects often late from time schedule have been agreement. This is making cost of the project expensive. Network planning with critical path method can help solve this problem. Objective of this research are identification of critical activity and founding of degree efficiency in time schedule planning. Result of this research have shown that time and cost calculation by firm are 163 days and of the pro Rp. 2.035.866.350,-. But, in this research are 127 days and total cost Rp. 2.049.388.624,-. So, the efficiency of this planning is 36 days or 22.08%.
No. Panggil
-
Penerbit UPN "Veteran" Jakarta : Jakarta.,
Deskripsi Fisik
-
Bahasa
Indonesia
ISBN/ISSN
1693-8550
Klasifikasi
-
Tipe Isi
-
Tipe Media
-
Tipe Pembawa
-
Edisi
Desember 2010, Vol. 6 No. 1
Subyek
Info Detil Spesifik
Halaman 1-18
Pernyataan Tanggungjawab

Versi lain/terkait

Tidak tersedia versi lain


Lampiran Berkas



Informasi


DETAIL CANTUMAN


Kembali ke sebelumnya